Corey Agnew
← All projects Tools for my work

Proposal-to-report builder

One first meeting became a proposal, a technician field brief, and per-site reports written straight from lab certificates.

Gives backone chain, reused for every new site

The itch

A colleague in sales landed a first meeting with a public fleet operator. They had several fueling sites and no fuel quality program at all. One meeting had to turn into a lot of paper, fast:

  • a proposal they could approve,
  • a plan the technicians could follow in the field,
  • and, after sampling, reports clear enough for a board to act on.

Each of those used to start from a blank page.

What I built

A chain where each step feeds the next:

  1. Discovery. A short framework for the first meeting: what to ask, what to look at, and what a good outcome looks like. Public tank registration records came in as inputs before anyone set foot on site.
  2. Proposal. Drafted from the discovery notes, with leave-behinds for the meeting.
  3. Technician field brief. The scope of work turned into a plain checklist: which tanks, how to sample, and what to record.
  4. Reports. When the lab certificates came back, a report per site plus a summary for the whole program, written from the certificates themselves.

How AI helped

Claude drafted every document in the chain, and I reviewed and approved each one before it went anywhere. The important trick is that each step reuses the facts from the step before. The site list from discovery flows into the proposal, the proposal's scope becomes the field brief, and the field brief's sample points line up with the lab certificates. Nothing gets retyped, so nothing drifts.

The report step leans on the same fuel quality rubric as my other tools, so a reading means the same thing in a report as it does everywhere else.

What it gave back

The program was approved, and now there's a chain I can reuse for any fleet or municipal customer. I didn't record how long proposals took before, so I won't put a number on the time saved.

What I'd do differently

Time it. I'd log hours on the very first run, so that the next "it's faster now" comes with a real number attached.

Contact me

If something here sparked an idea, or you're building something similar, I'd love to hear about it.

coreyagnew@protonmail.com